Decisions

What has been decided – and what it is meant to do

Since March 2025 the Bundestag, the federal government and the EU have published a chain of decisions: a constitutional amendment, statutes, economic plans, budget lines, funding programmes and regulations. Each document is listed here with its reference, core content and purpose – the purpose in the words of the explanatory memorandum.

€500 bnspecial fund under Art. 143h of the Basic Law, approved within twelve years
€22.0 bnfrom the special fund for transport in 2026, after €11.7 bn in 2025
€16.3 bnof which in 2026 for maintaining the federal railway lines
€2.45 bnin 2026 for ERTMS – in infrastructure and rolling stock
13corridor renewals 2027–2031 instead of 21 so far (BMV, 9 Oct 2026)

As of 23 October 2026. 2025/2026 totals from the three transport lines in the BMF's simplified overview of the economic plans.

Germany: nine documents

From the constitutional amendment to the budget line. The right-hand column quotes what each document is meant to achieve.

DocumentReferenceWhat it saysWhat it is meant to do
Basic Law Art. 143h22 Mar 2025, BGBl. 2025 I No 94Special fund of up to €500 bn for additional investment in infrastructure and in climate neutrality by 2045; €100 bn for the Länder, €100 bn for the Climate and Transformation Fund; approvals within twelve years.“… over many years an immense public investment backlog in digitalisation and infrastructure has built up.” (Bundestag printed paper 20/15096, own translation)
SVIKG30 Sep 2025, BGBl. 2025 I No 230Nine federal areas; additional only if the federal budget invests more than 10%; approvals by 31 Dec 2036; success control.The fund “secures a long-term financing basis for investment in the modernisation of Germany”. Starting point: the “degree of modernity of the public capital stock” had been declining. (Printed paper 21/779, own translation)
LuKIFG20 Oct 2025, BGBl. 2025 I No 246€100 bn for Länder and municipalities by a fixed key; provider-neutral; from €50,000 per measure.The Länder receive “€100 billion also for investment by the Länder in their infrastructure”. (Art. 143h(2) Basic Law, own translation)
Economic plans of the special fund 2025 and 2026adopted October 2025 and December 2025Transport 2026: €16.3 bn maintenance of rail lines, €3.25 bn federal trunk road bridges and tunnels, €2.45 bn ERTMS.Budget line verbatim: “Equipping German infrastructure and rolling stock (trains, wagons) with the European train control system ERTMS” (own translation).
BSWAG § 11c – general renewal3 Jul 2024, BGBl. 2024 I No 22441 high-performance corridors. Maintenance and replacement are bundled during “a one-off closure lasting several months”.Infrastructure-related disruptions are to “fall by 80 per cent” – at the latest 100 days after reopening. (BMV, 9 Oct 2026, own translation)
BSWAG § 1(3)current versionUpgrading, new construction and replacement of federal railway lines “is in the overriding public interest and serves public security”.The weight of rail in planning and permitting trade-offs.
Infrastructure Future Act22 Jul 2026, BGBl. 2026 I No 224Easier planning and permitting, covering “also all transport infrastructure measures financed from the special fund”.“The central aim of the act is to significantly increase the efficiency of planning and approval procedures in general and in particular for transport and energy.” (Printed paper 21/4099, own translation)
Truck toll, BFStrMG §§ 3 and 11current versionThe toll rate includes a component for the cost of CO₂ emissions. Half of the revenue is earmarked for federal trunk roads.The rest is to be used “predominantly for measures relating to federal railway lines”. (§ 11(3), own translation)
Coalition agreement 2025CDU, CSU and SPDPolitical declaration of intent, not law.“We want to shift more freight from road to rail.” (own translation)

What the federal budget sets aside for rail freight

Budget lines in section 12 of the federal budget, in € million.

Line (wording, shortened)Budget 2026Budget 2025
Grants to private companies for investment in combined transport90.392.7
Investment grants … sidings and other rail freight facilities30.030.0
Reduction of rail freight track access charges265.0275.0
Support for single wagonload traffic300.0300.0
Reduction of rail freight facility charges–35.0

What that means: the money goes to terminals and sidings, track access costs and single wagonload – access to the network and the cost of using it. Support for facility charges is no longer in the 2026 budget.

General renewal: the new schedule

On 9 October 2026 the BMV and DB InfraGO slimmed down the sequence: 13 instead of 21 corridor renewals from 2027 to 2031. “No corridor renewals are cancelled, only postponed” (own translation). The sequence from 2032 follows next year.

YearCorridors
2027Lehrte – Berlin · Rosenheim – Salzburg · Fulda – Hanau
2028Köln – Koblenz · München – Rosenheim (1) · Hagen – Unna – Hamm · Lübeck – Hamburg
2029Hamburg – Hannover · Würzburg – Ansbach – Treuchtlingen · Aachen – Köln
2030Stendal – Magdeburg · Uelzen – Stendal
2031Lehrte – Groß Gleidingen · München – Rosenheim (2)
  • ETCS becomes standard: ETCS is in principle to be prepared and installed during corridor renewals. The later switch to “ETCS Level 2 without signals” “can take place once the vehicle fleets have largely been retrofitted” (own translation).
  • Diversions for freight: for Lehrte – Berlin a second diversion route for freight will be available from February.
  • First results: on Nuremberg – Regensburg infrastructure-related disruptions have “fallen by more than 90 per cent”. Obertraubling – Passau and Troisdorf – Wiesbaden reopen in mid-December 2026.

Europe: seven dossiers

The TEN-T Regulation (EU) 2024/1679 is covered under Rail & combined transport. These are the dossiers added since.

DocumentStatus October 2026CorePurpose
Commission's Greening Freight packageproposals of 11 Jul 2023Weights and dimensions, rail capacity, emissions accounting; plus the revision of the Combined Transport Directive.“… cutting transport emissions by 90% by 2050 …” – without holding back the single market.
Capacity Regulation (EU) 2026/1184adoptedTrain paths are allocated with European coordination. Until now: “decided annually, nationally and manually”.Cross-border freight: “around 50% of rail freight crosses borders”.
CountEmissionsEU, Regulation (EU) 2026/1030adoptedCommon method for the greenhouse gas accounting of transport services.–
Revision of the Combined Transport Directive, 2023/0396(COD)proposal; in Parliament “Awaiting committee decision”Support for operations that cut external costs by at least 40% compared with road-only transport.Make intermodal transport more competitive.
Revision of weights and dimensions, 2023/0265(COD)Parliament has adopted its position; Council's first-reading position pendingRevision of Directive 96/53/EC.Part of the Greening Freight package.
Connecting Europe Facility, transport2024 call, awarded 07/2025€2.8 bn for 94 projects; 77% goes to rail.Building out the TEN-T.
Commission's military mobility packageproposalFaster movement of equipment and personnel across borders.The Commission's finding: “Transport capabilities, such as flatbed wagons and Ro-Ro ferries, remain scarce.”